IFS was contracted to move an offshore generator set comprising of a 220 Ton Engine and a 55 Ton Alternator with various oversized accessories. Our role was to arrange delivery of the cargo from multiple storage locations in Germany using inland coaster vessels and trucks into the port of loading. Upon arrival at the port, the cargo was discharged to the quay using mobile cranes specially hired and brought in for the operation. Finally, upon arrival of the heavy-lift ocean-going vessel, we arranged via our stevedoring partners for the pre-slinging and lifting to the ships hold.
Category: Projects